We are specialists in Beautification, Wetland and Native Re-Vegetation Projects, Large Scale Commercial Landscaping, Plant Establishment and Maintenance, Irrigation Design and Installation, Weed and Pest Control.

Since its establishment in 2003, Arco has been heavily involved in the majority of the Re-Vegetation / Beautification Projects around the Greater Taupo Region. With a dedicated team within the company specifically for this type of work, Arco Environmental Contractors is able to provide our clients with peace of mind that each project undertaken will be delivered on time, within budget and to the highest standard. With each project undertaken, Arco designs, develops and supplies its client with a customised Plant Maintenance Program, to ensure the longevity of the plants is achieved.

Wairakei Pastoral Beautification Project 2014

Arco was successful with our tender for the Wairakei Estate Land Development – 2014 Beautification Works to Wairakei Estate. This project involved the Beautification of 9 recently developed farms.

Arco are responsible and accountable for the following areas of the project:

  • Beautification Advice
  • Project Management
  • Procurement and Planting of Plants
  • Procurement, Cartage and Placement of Bulk Soil Conditioner and Mulch
  • Land Preparation for Planting
  • Earthworks and Cartage
  • Avenue and Roadside Copse Planting (Auguring 800mm by 600mm planting holes and complete removal of soil and replacement with Soil Conditioner)
  • Shelterbelt and Paddock Tree Planting (Auguring 800mm by 200mm planting holes and removal of top 300mm of soil and replacement with Soil Conditioner)
  • Landscaping of Farm Entrance Ways
  • Design and build Paddock Trees and Roadside Copses
  • Fencing (Post and Rail)
  • Plant Establishment and Maintenance (based on a 3 year period)
  • Fertilisation
  • Procure and Install Irrigation systems
  • Pest Monitoring and Control

Ohaaki Wetland Project

Arco are responsible and accountable for the following areas of the project:

  • Project Management
  • Land Preparation for Planting
  • Plant Establishment and Maintenance (currently on-going)
  • Fencing (Post and Rail)
  • Fertilisation

Arco created, implemented and currently maintains a robust Plant Maintenance Program. This program was based on a 4 year period. During last summer, Taupo experienced extremely dry weather, our establish Plant Maintenance Program ensured the impact of the dry conditions had minimal effect on the establishing plants.

Due to the wetland environment, the weed control maintenance part for the program was review after 6 months and adjusted slightly. This was to ensure the establishing plants were not out grown by unwanted plants.

Ohaaki Wetland Project
Ohaaki Wetland Project

Ohaaki Wetland Project
Ohaaki Wetland Project

Taupo Eastern Bypass

Arco was responsible and accountable for the following areas of the project:

  • Project Management of planting
  • Procurement of Client Specified Plant Stock
  • Land Preparation for Planting
  • Plant Establishment and Maintenance

The Kinloch Club - A Jack Nicklaus Signature Golf Course

Arco was responsible and accountable for the following areas of the project:

  • Project Management
  • Procurement of Plant Stock
  • Land Preparation for Planting
  • Plant Establishment and Maintenance
  • Landscaping
  • Design and build
  • Fencing (Post and Rail)
  • Fertilisation and Irrigation systems
  • Pest Control